Abstract
The field project for the Summer of 1974 had three primary goals, each of which was attained with some interesting results which we will give here briefly. A full report is currently in preparation for the National Park Service (Wright, 1975). 1. Complete the surface survey of the valley floor. 2. Extend the survey into the high country. 3. Test excavate at least two sites. Project Number 190.