Research Project Report
Abstract
During June and July of 1971 sampling was completed on the 21 sites which were established in the summer of 1970. In addition, there were ten new sites established. These ten were added in the low sagebrush, big sagebrush on alluvium, and big sagebrush-bitterbrush areas. This was done in order for there to be more adequate sampling in each of these three types. Project Number 169.